T: 01204 699930

Pencoed Comprehensive School

clips / Football / hockey / Rugby

Location: Bridgend- Wales, UK
Product: Evolution XQ 40 and TX SW
Date: Spring 2016

Project Description:

GreenFields were chosen by Pencoed Comprehensive School, Wales to install 2 new pitches as part of their sports development. The first pitch (42m x 33m) utilising the Evolution XQ 40 product can be utilised for a range of sports and uses TenCate XQ™ Technology to provide not only a plush green appearance but also exceptional split resistance and sliding friendliness and resistance. The 97m x 61m TX SW pitch accompanied the 3G pitch at Pencoed and was completed with surrounding floodlights.